CNOOC Ltd. started production from Luda 5-2 oilfield north Phase I and Kenli 6-1 oilfield 4-1 block.
The Luda 5-2 north phase I project lies in Liaodong Bay of Bohai Sea, with average water depth of about 32 m. The project is utilizing existing processing infrastructure of Suizhong 36-1 oilfield and includes a new-build thermal recovery wellhead platform and production platform. A total of 28 development wells are planned, including 26 production wells and 2 water source wells. The project is expected to reach peak production of about 8,200 b/d of crude oil in 2024.
The Kenli 6-1 4-1 block development project lies in south Bohai Sea, with average water depth of about 17 m. The project utilizes the existing processing infrastructure of Bozhong 34-9 oilfield. A total of 12 development wells are planned, including 7 production wells and 5 water injection wells. The field is expected to reach peak production of about 4,000 b/d of crude oil in 2022.
CNOOC is operator of both projects with 100% interest.
Read the latest issue of the OGV Energy magazine HERE
Eni to Divest Its UK Upstream Assets to Ithaca Energy
Nigeria begins production from Awoba, Madu oil and gas fields to boost domestic supply
Ithaca Energy acquires Eni’s UK business in £750m deal
Iraq awards Akkas gas field development contract to Ukrainian firm