CNOOC adds production from two project starts
CNOOC Ltd. started production from Luda 5-2 oilfield north Phase I and Kenli 6-1 oilfield 4-1 block.
The Luda 5-2 north phase I project lies in Liaodong Bay of Bohai Sea, with average water depth of about 32 m. The project is utilizing existing processing infrastructure of Suizhong 36-1 oilfield and includes a new-build thermal recovery wellhead platform and production platform. A total of 28 development wells are planned, including 26 production wells and 2 water source wells. The project is expected to reach peak production of about 8,200 b/d of crude oil in 2024.
The Kenli 6-1 4-1 block development project lies in south Bohai Sea, with average water depth of about 17 m. The project utilizes the existing processing infrastructure of Bozhong 34-9 oilfield. A total of 12 development wells are planned, including 7 production wells and 5 water injection wells. The field is expected to reach peak production of about 4,000 b/d of crude oil in 2022.
CNOOC is operator of both projects with 100% interest.
Published: 25-04-2022