Sponsored by RCP - OGV Energy
International

CNOOC adds production from two project starts

CNOOC adds production from two project starts

 

CNOOC Ltd. started production from Luda 5-2 oilfield north Phase I and Kenli 6-1 oilfield 4-1 block.

The Luda 5-2 north phase I project lies in Liaodong Bay of Bohai Sea, with average water depth of about 32 m. The project is utilizing existing processing infrastructure of Suizhong 36-1 oilfield and includes a new-build thermal recovery wellhead platform and production platform. A total of 28 development wells are planned, including 26 production wells and 2 water source wells. The project is expected to reach peak production of about 8,200 b/d of crude oil in 2024.

The Kenli 6-1 4-1 block development project lies in south Bohai Sea, with average water depth of about 17 m. The project utilizes the existing processing infrastructure of Bozhong 34-9 oilfield.  A total of 12 development wells are planned, including 7 production wells and 5 water injection wells. The field is expected to reach peak production of about 4,000 b/d of crude oil in 2022.

CNOOC is operator of both projects with 100% interest.

Published: 25-04-2022

Share:

Subscribe for the Latest News and Updates

Marketing Permissions

OGV Energy will use the information you provide on this form to be in touch with you and to provide updates and marketing through the following methods:

  • Email
  • Direct Mail
  • Customised Online Advertising

Read the latest issue of the OGV Energy magazine

More News

Latest Magazine Banner

Marine and Lifting - OGV Magazine - Issue 87

WellPro Group Banner

Cegal Banner

Leyton Banner

Advertise with OGV Energy Banner