Company news

Dril-Quip delivers latest wellhead equipment for Petrobras deepwater project

Dril-Quip delivers latest wellhead equipment for Petrobras deepwater project

Dril-Quip has installed an 18 ¾-inch BigBore IIe, its newest subsea wellhead system, for the Petrobras Exploratory project in the Aram Block in the Santos Basin offshore Brazil.

 

Dril-Quip has installed an 18 ¾-inch BigBore IIe, its newest subsea wellhead system, for the Petrobras Exploratory project in the Aram Block in the Santos Basin offshore Brazil.

Water depth is 2,002 m.

According to Dril-Quip, the system’s sealing technology is qualified to the latest Petrobras standards. It is designed to reduce costs through dispensing with the need for drilling or production lockdown devices, which in turn limits the number of trips associated with drilling the well.

The technology has been fatigue tested to more than 90 million bending cycles with 2 MMlb of gas-tight hanger lockdown capacity to resist thermal and pressure loads.

BigBore IIe comes in pressure capacities of 15,000 psi/27-inch (SS15) and 20,000 psi/30-in. (SS20), and it can be supplied with legacy profiles or the company’s DXe locking profile.

Both 16-inch and 18-inch casing, casing hangers and seal assemblies can pass through the 21-inch OD drilling riser, 18-3/4-inch BOP stack and the wellhead housing.

Published: 12-06-2023

Share:

Subscribe for the Latest News and Updates

Marketing Permissions

OGV Energy will use the information you provide on this form to be in touch with you and to provide updates and marketing through the following methods:

  • Email
  • Direct Mail
  • Customised Online Advertising

OGV Energy - Issue 89 Subsea

Read the latest issue of the OGV Energy magazine

More News

Latest Magazine Banner

Marine and Lifting - OGV Magazine - Issue 87

WellPro Group Banner

Cegal Banner

Leyton Banner

Advertise with OGV Energy Banner