MUSCAT, Oman — The jackup Energy Emerger has spud the Yumna-5 well for Masirah Oil on the Yumna Field in Block 50 offshore Oman.
This is part of a program that includes the workover of the existing production wells, Yumna-2 and Yumna-3. Operations should last about 90 days.
The Yumna-5 well will be drilled at the crest of the structure to drain attic oil left un-swept by the current producers.
Read the latest issue of the OGV Energy magazine HERE
OPEC cuts 2024, 2025 global oil demand growth view again
CNOOC Achieves Record Oil and Gas Production from Deep Sea #1 Field
Egypt aims to boost natural gas output by 30% end-2025
Azets strengthens Aberdeen team with four senior-level hires to meet local demand and support growth plans