SJI™ P & A technology created by Titan Torque and HRG Well Solutions
Titan Torque and HRG Well Solutions are proud to present the SJI™: an innovative, patent-pending technology, improving the overall efficiency of decommissioning projects. The SJI™ system optimizes the conventional methods for the P&A of wells.
To improve efficiencies, reduce costs and exposure in the Plug and Abandonment (P&A) market, the Slot Jet Isolate (SJI™) tool has been developed to overcome the existing challenges with the incumbent methods.
Traditional P&A methods typically use a combination of either explosive, mechanical cutters, chemical methods, or abrasive cutters. The existing methods all require multiple trips, increasing rig time costs and expose personnel to health and safety risks during every trip.
The SJI™ tool offers the following advantages:
Explosive free
Single trip system
The repeatable mechanical multi-use slotting system
Key performance indicators at the surface during execution
No Permits required for the execution
No sump required
Provides stand-off after slotting
Slotted length/depth can be changed in the hole (no waiting for log interpretation)
Can be customisable to different casing sizes on location
To find out more, please get in touch with us at SJI@titantorque.co.uk.
Read the latest issue of the OGV Energy magazine HERE.
Published: 11-03-2021